Synroof Hi Build BD Price

10,500.00৳ 

Synroof Hi Build BD Price

Premium Quality Acrylic Waterproofing Coating.

GENERAL:

  • BITUMAT Synroof Hi Build, an elastomeric, premium quality acrylic coating, may be applied by brush, roller, squeegee or spray equipment depending on site conditions. To spray, select a nozzle size of at least 0.028 inch; first checking the spray equipment to ensure suitability.
  • All surfaces to be coated must be clean, dry, free from dust, dirt, oil and other contaminants.
  • Coverage rate varies depending on factors such as type and quality of substrates i.e. surface regularity and application method.
  • Apply in separate coats, each at a right angle to the one before. Using a different colour for each coat helps ensure consistency of cover.
  • The final coating thickness to be achieved depends on the requirements of the individual roof. A final dry film thickness between 0.5 and 1.5 mm may be built-up.

Call: +8801967256385, E-mail: info@fortimixbd.com

Synroof Hi Build BD Price

Premium Quality Acrylic Waterproofing Coating.Welcome to Fortimix BD Construction

GENERAL:

  • BITUMAT Synroof Hi Build, an elastomeric, premium quality acrylic coating, may be applied by brush, roller, squeegee or spray equipment depending on site conditions. To spray, select a nozzle size of at least 0.028 inch; first checking the spray equipment to ensure suitability.
  • All surfaces to be coated must be clean, dry, free from dust, dirt, oil and other contaminants.
  • Coverage rate varies depending on factors such as type and quality of substrates i.e. surface regularity and application method.
  • Apply in separate coats, each at a right angle to the one before. Using a different colour for each coat helps ensure consistency of cover.
  • The final coating thickness to be achieved depends on the requirements of the individual roof. A final dry film thickness between 0.5 and 1.5 mm may be built-up.

PRIMING:

  • Old asphalt surfaces and bituminous roofing felt. Cut felt blisters crosswise, dry and re-bond with suitable adhesive. Allow to cure.
  • Then prime cleaned surface with BITUMAT Synroof Hi Build diluted with 20% water.
  • Concrete & Terrazo tile roofs. Following removal of all loose and other alien material, prime with Bitumat Synroof Hi-Build diluted with 20% water. Greater dilution may lead to weaker bonding with the substrate.
  • Metal roofs. Clean and remove all rust and apply a rust inhibitive primer. Follow this by applying metal primer to all corroded surfaces.
  • Other roofs. Should the roof be affected by algae or fungal growth, use a stiff bristled broom to remove this before treating the cleaned surface with a suitable fungicide, and apply primer coat by diluting BITUMAT Synroof Hi Build with 20% water.
Synroof Hi Build BD Price
Synroof Hi Build BD Price

Synroof Hi Build BD Price

PREPARATION:

Surface preparation is a very vital issue and this influences the integrity of the waterproofing system. Hence, care must be exercised when the preparation is done. This is very important when re-roofing over an existing old roof.

Instructions should be followed strictly.

  • All surfaces to be smooth, clean, dry and free from dust, rust and laitance.
  • Concrete and cementitious substrates must be well compacted with a wood float type finish, be at least 28 days old and well dried.
Un-cured concrete surface will have moisture trapped inside and will turn gaseous when temperature rises. This will lead to blistering and even delamination from the surface.
  • Wooden or metal panels to be firmly fixed in position.
  • Terrazo roof tiles: Clean and repair damaged joints. Ensure that the tiles are firmly grouted. Remove all loose material.
  • Metal Roofs: Wire brush to remove moss, mildew, loose paint, and rust areas, then clean surfaces with a broom before priming. High pressure water booming may be used, if necessary

Synroof Hi Build BD Price

APPLICATION:

  • Primer must be completely dry before the first coat is applied.
  • BITUMAT SYNROOF HI-BUILD may be applied by soft brush, roller or spray gun.
  • For spraying, BITUMAT Synroof Hi Build may be slightly diluted with water. To great a dilution may lead to sedimentation and blocking of spray gun.
  • Apply two coats, each at the approximate rate of 0.8 Kg/Sqm. (excluding the BITUMAT SYNROOF HI-BUILD prime coat).
  • Where substantial movement is anticipated in the substructure, a mesh reinforcement (60/80 gsm thermo-bonded polyester as part of a “sandwich” membrane system is used. Lay this mesh in the wet first coat before application of subsequent coats. All detailing to pipes, upstands, drains, projected line etc. should be mesh re-inforced in this way.
Synroof Hi Build BD Price
SYNROOF HI-BUILD BD Price

CURING:

Allow 24 hours between coats. A final curing time of 48 hours is adequate at normal working temperatures. Ensure curing is complete before laying thermal insulation boards, mechanical protect and other coverings.

MECHANICAL PROTECTION

Accessible roofs. The installed BITUMAT SYNROOF HI-BUILD can either be covered by insitu concrete screed or by thermal insulation. Place a non-woven polyester separation layer over the acrylic waterproofing membrane followed by appropriate thermal insulation boards. Then lay kraft paper or polyethylene sheets as separation layer over the insulation boards and place the topping screed of 4 to 5 cms thickness or suitable cement tiles.Non-accessible roofs. Place a non-woven polyester separation layer over the acrylic waterproofing membrane followed by the insulation boards. Cover the insulation with another layer of non-woven polyester separation layer and place 15/30 gauge washed gravel to a minimum depth of 5cm. For thicker insulation boards, the gravel depth should be at least equal to that of board thickness.

CLEAN-UP

As a good roofing practice, flush all hoses, equipment and tools with water immediately after use.

PACKING:

• 20 Kg. Metal Pails, others on request.

Synroof Hi Build BD Price

STORAGE:

  • Keep away from direct sunlight and preferably store below 30°C and above +5°C.
  • Protect from frost.
  • When stored in un-opened containers, expect a minimum shelf life of one year.
Synroof Hi Build BD Price
Synroof Hi Build BD Price
Facebook Page visit

Terms & Condition

Welcome to Fortimix BD Construction! By accessing and using our website, you agree to comply with the following terms and conditions. Please take a moment to carefully read them, as they govern your use of this site and our services.

1. General Information Fortimix BD Construction is a trusted partner offering comprehensive construction solutions. By using our website, you acknowledge and accept these terms and conditions as well as any applicable laws or regulations that govern the use of this site.

2. Scope of Services Our company provides a wide range of construction services, including but not limited to residential, commercial, and industrial projects. For more details about specific services, please refer to the dedicated sections on our website.

3. Usage of the Website You agree to use the website for lawful purposes only. Any misuse of our website, including attempting to breach its security or transmit harmful content, is strictly prohibited. You are responsible for ensuring that all information you provide is accurate and up-to-date.

4. Content Ownership All content on this website, including text, images, graphics, and logos, is the property of Fortimix BD Construction and is protected by intellectual property laws. Unauthorized use or reproduction of any content is prohibited.

5. Privacy Policy Your privacy is important to us. Please refer to our Privacy Policy for detailed information on how we collect, use, and protect your personal information.

6. Payment Terms For any services rendered by Fortimix BD Construction, payment terms will be outlined in the specific contract or agreement signed between the client and the company. Payments are due as per the terms outlined in each project agreement.

7. Liability Disclaimer While we make every effort to ensure the accuracy of the information on our website, Fortimix BD Construction does not guarantee the completeness, reliability, or accuracy of the content provided. You agree that any reliance on such content is at your own risk.

8. Project Termination and Cancellations We strive for excellence and on-time delivery. However, if for any reason a project needs to be canceled or delayed, both parties will mutually agree on the terms for such actions. For construction projects, any cancellations or changes will be subject to the terms stated in the contract.

9. Third-Party Links Our website may contain links to third-party websites. These links are provided for your convenience. Fortimix BD Construction does not endorse and is not responsible for the content, products, or services offered on these external sites.

10. Changes to Terms and Conditions We reserve the right to update, modify, or revise these terms and conditions at any time. Any changes will be reflected on this page with an updated “Last Modified” date. It is your responsibility to check these terms periodically to stay informed of any changes.

11. Dispute Resolution Any dispute arising from the use of this website or services provided by Fortimix BD Construction shall be resolved through negotiation. If a resolution cannot be reached, both parties agree to settle the dispute through arbitration in accordance with the laws of Bangladesh.

12. Governing Law These terms and conditions shall be governed by and construed in accordance with the laws of Bangladesh.

By continuing to use the website, you agree to these terms and conditions. If you do not agree, please refrain from using the website or any of the services provided by Fortimix BD Construction.

Thank you for choosing Fortimix BD Construction – Your trusted partner in delivering quality construction solutions.